New USDOT registrations, September 2026

19

50th of 51 · +46.2% vs Sep 2025

FMCSA Company Census File, as of 2026-10-17

New USDOT registrations, October 2025 to September 2026

178

0.10% of national · +7.9% vs prior 12 months

FMCSA Company Census File, as of 2026-10-17

New authority grants in Motus, September 2026

3

48th of 51 · legacy averaged 5 a month

FMCSA Motus AuthHist - All With History, as of 2026-10-18

New registrants sharing a phone or email with 3+ other USDOTs

3.4%

6 of 178 · national 2.3%

FMCSA Company Census File, as of 2026-10-17

Vermont added 19 new USDOT numbers in September 2026, 0.1% of the national total and 50th of 51, among the smallest volumes in the country. That was up 46.2% from September 2025 (13). Over the 12 months to September 2026, Vermont added 178, up 7.9% from the prior 12 months, ahead of the national change of +5.4%. That puts Vermont 50th for the year with 0.10% of all new registrations. With monthly counts this small, single-month changes can swing widely.

Before FMCSA's legacy data froze on May 14, 2026, the legacy system recorded new operating authority grants for an average of 5 USDOT numbers a month in Vermont (May 2025 to April 2026), 0.09% of the national total. In September 2026, Motus recorded 3, 0.06% of the national Motus count and 48th of 51, among the smallest volumes in the country.

Legacy data recorded an average of 6 involuntary revocations a month for USDOT numbers in Vermont before the freeze. Since the cutover, Motus records involuntary suspensions instead: 1 took effect for USDOT numbers in Vermont in September 2026 (43rd of 51, among the smallest volumes in the country), and 5 over the last three months. Insurance filings were cancelled (not replaced) for an average of 15 USDOT numbers a month in Vermont in the legacy data; Motus shows 1 in September 2026, a floor because Motus InsHist covers only authorities touched in Motus.

Of the 178 USDOT numbers added in Vermont from October 2025 to September 2026, 6 (3.4%) list a phone or email shared with at least 3 other USDOT records, above the national rate of 2.3%. That rate ranks 9th of the 51 states (including DC) with at least 100 new registrants. 5 of the 6 sit in clusters of 51 or more records. Interpretation: a higher rate can reflect a few busy filing services serving the state, so it is a reason to look closer, not evidence of fraud.

New USDOT registrations in Vermont

New USDOT registrations per month, VermontUSDOT numbers by the month they were added to the Company Census File
New USDOT registrations per month, VermontNew USDOT registrations per month, Vermont, October 2024 to September 2026. New USDOT registrations: latest complete month September 2026, 19. All values are in the data table below the chart.October 2024 New USDOT registrations: 11November 2024 New USDOT registrations: 8December 2024 New USDOT registrations: 13January 2025 New USDOT registrations: 17February 2025 New USDOT registrations: 6March 2025 New USDOT registrations: 14April 2025 New USDOT registrations: 16May 2025 New USDOT registrations: 26June 2025 New USDOT registrations: 16July 2025 New USDOT registrations: 12August 2025 New USDOT registrations: 13September 2025 New USDOT registrations: 13October 2025 New USDOT registrations: 13November 2025 New USDOT registrations: 10December 2025 New USDOT registrations: 11January 2026 New USDOT registrations: 13February 2026 New USDOT registrations: 13March 2026 New USDOT registrations: 11April 2026 New USDOT registrations: 18May 2026 New USDOT registrations: 17June 2026 New USDOT registrations: 16July 2026 New USDOT registrations: 12August 2026 New USDOT registrations: 25September 2026 New USDOT registrations: 19

Source: FMCSA Company Census File, as of 2026-10-17 (az4n-8mr2).

Data table (24 rows)
New USDOT registrations per month, Vermont
MonthNew USDOT registrations
Oct 202411
Nov 20248
Dec 202413
Jan 202517
Feb 20256
Mar 202514
Apr 202516
May 202526
Jun 202516
Jul 202512
Aug 202513
Sep 202513
Oct 202513
Nov 202510
Dec 202511
Jan 202613
Feb 202613
Mar 202611
Apr 202618
May 202617
Jun 202616
Jul 202612
Aug 202625
Sep 202619
New USDOT registrations, Vermont vs national (index)Each line = monthly registrations divided by its own Oct 2024 to Sep 2025 average, times 100. Above 100 means busier than that year.
  • All new registrations nationwide
  • Vermont
New USDOT registrations, Vermont vs national (index)New USDOT registrations, Vermont vs national (index), October 2024 to September 2026. All new registrations nationwide: latest complete month September 2026, 103. Vermont: latest complete month September 2026, 138. All values are in the data table below the chart.October 2024 All new registrations nationwide: 97 Vermont: 80November 2024 All new registrations nationwide: 82 Vermont: 58December 2024 All new registrations nationwide: 79 Vermont: 95January 2025 All new registrations nationwide: 103 Vermont: 124February 2025 All new registrations nationwide: 103 Vermont: 44March 2025 All new registrations nationwide: 119 Vermont: 102April 2025 All new registrations nationwide: 110 Vermont: 116May 2025 All new registrations nationwide: 105 Vermont: 189June 2025 All new registrations nationwide: 99 Vermont: 116July 2025 All new registrations nationwide: 105 Vermont: 87August 2025 All new registrations nationwide: 101 Vermont: 95September 2025 All new registrations nationwide: 98 Vermont: 95October 2025 All new registrations nationwide: 98 Vermont: 95November 2025 All new registrations nationwide: 78 Vermont: 73December 2025 All new registrations nationwide: 81 Vermont: 80January 2026 All new registrations nationwide: 103 Vermont: 95February 2026 All new registrations nationwide: 102 Vermont: 95March 2026 All new registrations nationwide: 122 Vermont: 80April 2026 All new registrations nationwide: 118 Vermont: 131May 2026 All new registrations nationwide: 118 Vermont: 124June 2026 All new registrations nationwide: 120 Vermont: 116July 2026 All new registrations nationwide: 113 Vermont: 87August 2026 All new registrations nationwide: 107 Vermont: 182September 2026 All new registrations nationwide: 103 Vermont: 138

Source: FMCSA Company Census File, as of 2026-10-17 (az4n-8mr2).

Data table (24 rows)
New USDOT registrations, Vermont vs national (index)
MonthAll new registrations nationwide (index)Vermont (index)
Oct 202496.980.0
Nov 202482.358.2
Dec 202478.694.5
Jan 2025103.0123.6
Feb 2025102.643.6
Mar 2025119.4101.8
Apr 2025110.3116.4
May 2025104.8189.1
Jun 202598.7116.4
Jul 2025105.087.3
Aug 2025100.794.5
Sep 202597.894.5
Oct 202597.694.5
Nov 202578.372.7
Dec 202581.080.0
Jan 2026103.394.5
Feb 2026102.094.5
Mar 2026122.280.0
Apr 2026117.7130.9
May 2026118.4123.6
Jun 2026120.3116.4
Jul 2026113.287.3
Aug 2026107.4181.8
Sep 2026103.4138.2

Operating authority grants

Legacy and Motus counts are separate lines. FMCSA's legacy data froze on May 14, 2026, and Motus records authority actions differently, so the gap at the break is not a measured change.

New operating authority grants per month, VermontDistinct USDOT numbers granted authority, by month. Two systems, two lines.
  • Legacy L&I (frozen May 14, 2026)
  • Motus (from May 15, 2026)
  • Partial month
  • Legacy data frozen May 14, 2026
New operating authority grants per month, VermontNew operating authority grants per month, Vermont, October 2024 to September 2026. Legacy L&I (frozen May 14, 2026): latest complete month April 2026, 6. Motus (from May 15, 2026): latest complete month September 2026, 3. All values are in the data table below the chart.October 2024 Legacy L&I (frozen May 14, 2026): 4November 2024 Legacy L&I (frozen May 14, 2026): 2December 2024 Legacy L&I (frozen May 14, 2026): 3January 2025 Legacy L&I (frozen May 14, 2026): 9February 2025 Legacy L&I (frozen May 14, 2026): 2March 2025 Legacy L&I (frozen May 14, 2026): 5April 2025 Legacy L&I (frozen May 14, 2026): 3May 2025 Legacy L&I (frozen May 14, 2026): 6June 2025 Legacy L&I (frozen May 14, 2026): 10July 2025 Legacy L&I (frozen May 14, 2026): 4August 2025 Legacy L&I (frozen May 14, 2026): 4September 2025 Legacy L&I (frozen May 14, 2026): 5October 2025 Legacy L&I (frozen May 14, 2026): 6November 2025 Legacy L&I (frozen May 14, 2026): 1December 2025 Legacy L&I (frozen May 14, 2026): 7January 2026 Legacy L&I (frozen May 14, 2026): 3February 2026 Legacy L&I (frozen May 14, 2026): 3March 2026 Legacy L&I (frozen May 14, 2026): 4April 2026 Legacy L&I (frozen May 14, 2026): 6May 2026 Legacy L&I (frozen May 14, 2026): 6 (partial month) Motus (from May 15, 2026): 0 (partial month)June 2026 Motus (from May 15, 2026): 1July 2026 Motus (from May 15, 2026): 0August 2026 Motus (from May 15, 2026): 6September 2026 Motus (from May 15, 2026): 3

Legacy and Motus record authority actions in different systems with different record structures. Compare their levels with care and do not read the gap at the cutover as a change in applications.

Source: FMCSA AuthHist - All With History (frozen 2026-05-14) (9mw4-x3tu); FMCSA Motus AuthHist - All With History, as of 2026-10-18 (yu5v-wbh6).

Data table (24 rows)
New operating authority grants per month, Vermont
MonthLegacy L&I (frozen May 14, 2026)Motus (from May 15, 2026)
Oct 20244–
Nov 20242–
Dec 20243–
Jan 20259–
Feb 20252–
Mar 20255–
Apr 20253–
May 20256–
Jun 202510–
Jul 20254–
Aug 20254–
Sep 20255–
Oct 20256–
Nov 20251–
Dec 20257–
Jan 20263–
Feb 20263–
Mar 20264–
Apr 20266–
May 20266(partial)0(partial)
Jun 2026–1
Jul 2026–0
Aug 2026–6
Sep 2026–3

Revocations, suspensions and insurance

Involuntary revocations (legacy) and suspensions (Motus) per month, VermontDistinct USDOT numbers, by the month the action took effect
  • Legacy: involuntary revocations
  • Motus: involuntary suspensions
  • Partial month
  • Legacy data frozen May 14, 2026
Involuntary revocations (legacy) and suspensions (Motus) per month, VermontInvoluntary revocations (legacy) and suspensions (Motus) per month, Vermont, October 2024 to September 2026. Legacy: involuntary revocations: latest complete month April 2026, 3. Motus: involuntary suspensions: latest complete month September 2026, 1. All values are in the data table below the chart.October 2024 Legacy: involuntary revocations: 8November 2024 Legacy: involuntary revocations: 6December 2024 Legacy: involuntary revocations: 3January 2025 Legacy: involuntary revocations: 4February 2025 Legacy: involuntary revocations: 3March 2025 Legacy: involuntary revocations: 5April 2025 Legacy: involuntary revocations: 1May 2025 Legacy: involuntary revocations: 7June 2025 Legacy: involuntary revocations: 6July 2025 Legacy: involuntary revocations: 9August 2025 Legacy: involuntary revocations: 6September 2025 Legacy: involuntary revocations: 7October 2025 Legacy: involuntary revocations: 9November 2025 Legacy: involuntary revocations: 6December 2025 Legacy: involuntary revocations: 2January 2026 Legacy: involuntary revocations: 5February 2026 Legacy: involuntary revocations: 3March 2026 Legacy: involuntary revocations: 5April 2026 Legacy: involuntary revocations: 3May 2026 Legacy: involuntary revocations: 0 (partial month) Motus: involuntary suspensions: 0 (partial month)June 2026 Motus: involuntary suspensions: 0July 2026 Motus: involuntary suspensions: 2August 2026 Motus: involuntary suspensions: 2September 2026 Motus: involuntary suspensions: 1

This is not the same legal action as the legacy series. Since the cutover, FMCSA's public Motus data records involuntary suspensions where the legacy data recorded involuntary revocations.

Source: FMCSA Revocation - All With History (frozen 2026-05-14) (sa6p-acbp); FMCSA Motus AuthHist - All With History, as of 2026-10-18 (yu5v-wbh6).

Data table (24 rows)
Involuntary revocations (legacy) and suspensions (Motus) per month, Vermont
MonthLegacy: involuntary revocationsMotus: involuntary suspensions
Oct 20248–
Nov 20246–
Dec 20243–
Jan 20254–
Feb 20253–
Mar 20255–
Apr 20251–
May 20257–
Jun 20256–
Jul 20259–
Aug 20256–
Sep 20257–
Oct 20259–
Nov 20256–
Dec 20252–
Jan 20265–
Feb 20263–
Mar 20265–
Apr 20263–
May 20260(partial)0(partial)
Jun 2026–0
Jul 2026–2
Aug 2026–2
Sep 2026–1
Insurance filings cancelled (not replaced) per month, VermontDistinct USDOT numbers, by the month the cancellation took effect
  • Legacy L&I (frozen May 14, 2026)
  • Motus (from May 15, 2026)
  • Partial month
  • Legacy data frozen May 14, 2026
Insurance filings cancelled (not replaced) per month, VermontInsurance filings cancelled (not replaced) per month, Vermont, October 2024 to September 2026. Legacy L&I (frozen May 14, 2026): latest complete month April 2026, 12. Motus (from May 15, 2026): latest complete month September 2026, 1. All values are in the data table below the chart.October 2024 Legacy L&I (frozen May 14, 2026): 14November 2024 Legacy L&I (frozen May 14, 2026): 13December 2024 Legacy L&I (frozen May 14, 2026): 12January 2025 Legacy L&I (frozen May 14, 2026): 16February 2025 Legacy L&I (frozen May 14, 2026): 6March 2025 Legacy L&I (frozen May 14, 2026): 13April 2025 Legacy L&I (frozen May 14, 2026): 15May 2025 Legacy L&I (frozen May 14, 2026): 18June 2025 Legacy L&I (frozen May 14, 2026): 19July 2025 Legacy L&I (frozen May 14, 2026): 14August 2025 Legacy L&I (frozen May 14, 2026): 16September 2025 Legacy L&I (frozen May 14, 2026): 15October 2025 Legacy L&I (frozen May 14, 2026): 16November 2025 Legacy L&I (frozen May 14, 2026): 17December 2025 Legacy L&I (frozen May 14, 2026): 10January 2026 Legacy L&I (frozen May 14, 2026): 12February 2026 Legacy L&I (frozen May 14, 2026): 12March 2026 Legacy L&I (frozen May 14, 2026): 13April 2026 Legacy L&I (frozen May 14, 2026): 12May 2026 Legacy L&I (frozen May 14, 2026): 10 (partial month) Motus (from May 15, 2026): 1 (partial month)June 2026 Motus (from May 15, 2026): 1July 2026 Motus (from May 15, 2026): 7August 2026 Motus (from May 15, 2026): 1September 2026 Motus (from May 15, 2026): 1

The Motus InsHist dataset is far smaller than the legacy one (63,228 rows in total when checked in October 2026) and covers only authorities touched in Motus. Its counts are a floor, not a like-for-like continuation of the legacy level.

Source: FMCSA InsHist - All With History (frozen 2026-05-14) (6sqe-dvqs); FMCSA Motus InsHist - All With History, as of 2026-10-18 (3uet-3z4i).

Data table (24 rows)
Insurance filings cancelled (not replaced) per month, Vermont
MonthLegacy L&I (frozen May 14, 2026)Motus (from May 15, 2026)
Oct 202414–
Nov 202413–
Dec 202412–
Jan 202516–
Feb 20256–
Mar 202513–
Apr 202515–
May 202518–
Jun 202519–
Jul 202514–
Aug 202516–
Sep 202515–
Oct 202516–
Nov 202517–
Dec 202510–
Jan 202612–
Feb 202612–
Mar 202613–
Apr 202612–
May 202610(partial)1(partial)
Jun 2026–1
Jul 2026–7
Aug 2026–1
Sep 2026–1

How Vermont ranks

Vermont values, national rank and share of the national total by series
MeasurePeriodVTRankShareChange
New USDOT registrationsOctober 2025 to September 202617850 of 510.10%+7.9% vs prior 12 months
New USDOT registrationsSep 20261950 of 510.1%+46.2% vs Sep 2025
New authority grants (Motus)Sep 2026348 of 510.06%–
Involuntary suspensions effective (Motus)Sep 2026143 of 510.08%–
Insurance cancellations (Motus, floor)Sep 2026148 of 510.04%–
New authority grants (legacy)May 2025 to Apr 20265948 of 510.09%–
Involuntary revocations (legacy)May 2025 to Apr 20266848 of 510.09%–
Registrants sharing contact detailsOctober 2025 to September 20266 (3.4%)9 of 51 by rate0.1%–

Ranks are among the 50 states and DC (ties share a rank). Shares are of national totals, which include carriers based in U.S. territories, Canada and Mexico. Shared-contact rank is by rate among states with at least 100 new registrants. Sources: FMCSA Company Census File, as of 2026-10-17; Motus and legacy L&I datasets listed in the issue method.

Method notes

The May 14, 2026 method break
FMCSA's legacy L&I datasets (AuthHist, Revocation, InsHist and others) stopped updating on 2026-05-14. Their descriptions now say they will no longer be updated. FMCSA's Motus system replaced them, and its public datasets update daily. Legacy series stop at May 2026 and Motus series start at May 2026, and May is marked partial in both. The two are never joined into one line, because the systems record actions differently. Motus rows dated before 2026-05-15 are migrated history for authorities later touched in Motus, so they are excluded.
Units
Event series count distinct USDOT numbers per month, so a carrier with several authorities or filings affected in the same month counts once. Legacy rows with a USDOT of 00000000 (old dockets with no USDOT on file) are excluded. A USDOT affected in two different months counts in both.
How states are assigned
States come from the physical address (phy_state) in the Company Census File as of its 2026-10-17 load, not the address at the time of the event. Event datasets are joined to the census on USDOT number with a SoQL JOIN. Share of national counts that land in one of the 50 states or DC: registrations 98.4%, legacy grants 97.3%, Motus grants 97.6%, legacy revocations 97.9%, Motus suspensions 98.2%, legacy insurance cancellations 98.7%, Motus insurance cancellations 98.6%. The rest are carriers based in U.S. territories, Canada or Mexico, or USDOT numbers with no census match. National totals include them, so state shares add up to a little under 100%.

How to cite

CarrierKYC, "Vermont trucking authority and carrier risk data (October 2026)," Freight Identity Risk Report, updated 2026-10-19. https://carrierkyc.com/report/state/vermont. Data: FMCSA via data.transportation.gov. License: CC BY 4.0.

Free to reuse with attribution under CC BY 4.0. Download the October 2026 data: CSV.

For factoring companies

Stop paying the wrong account.

CarrierKYC verifies that the person onboarding controls the carrier and that the bank account belongs to it, then re-verifies every remit-to change before the next ACH. Free 60-day pilot for small factors.

Monthly · free

The Freight Identity Risk Report

New authorities, revocations, insurance cancellations, and shared-contact clusters from FMCSA data, every month. One email. Unsubscribe in one click.